Challenge:
Difficulty in managing more number of physical servers. Multiple servers resulted in more power consumption in terms of various aspects such as cooling, space, etc. which was increasing the overall manufacturing cost.

 

Solution:
We have given Hyper-converged infrastructure to optimize their usage with respect to their applications.

 

Result: